Assam Rural Infrastructure Mission (ARIM) 2023, Apply Now & Get essential infrastructure facilities

Assam Rural Infrastructure Mission (ARIM): 

Introduction:

The Assam Rural Infrastructure Mission (ARIM) is a flagship initiative of the Assam government aimed at transforming the state’s rural landscape by providing essential infrastructure facilities. This ambitious mission seeks to address the challenges faced by rural communities in accessing basic amenities and services, thereby improving their overall quality of life.

(অত্যাৱশ্যকীয় আন্তঃগাঁথনি সা-সুবিধা প্ৰদান কৰি ৰাজ্যৰ গ্ৰাম্য পৰিৱেশৰ পৰিৱৰ্তনৰ লক্ষ্যৰে অসম চৰকাৰৰ এক প্ৰধান পদক্ষেপ অসম গ্ৰাম্য আন্তঃগাঁথনি অভিযান। এই অভিলাষী অভিযানে গ্ৰাম্য সম্প্ৰদায়সমূহে মৌলিক সুবিধা আৰু সেৱাসমূহ লাভ কৰাৰ ক্ষেত্ৰত সন্মুখীন হোৱা প্ৰত্যাহ্বানসমূহৰ সৈতে মোকাবিলা কৰিব বিচাৰে, যাৰ ফলত তেওঁলোকৰ সামগ্ৰিক জীৱনৰ মান উন্নত হয়।)

Objectives of ARIM:

The ARIM has been designed with the following primary objectives:
(তলত উল্লেখ কৰা প্ৰাথমিক লক্ষ্যৰে ARIM ৰ ডিজাইন কৰা হৈছে):

  • Enhancing Rural Connectivity: To improve connectivity within rural areas and with urban centers by constructing and upgrading roads, bridges, and culverts.

  • Strengthening Rural Infrastructure: To develop essential infrastructure such as irrigation canals, drainage systems, and flood protection measures to support agriculture and enhance resilience to natural disasters.

  • Promoting Rural Development: To facilitate socio-economic development in rural areas by providing access to clean drinking water, sanitation facilities, and renewable energy sources.

Key Features of ARIM:

The ARIM is characterized by several key features that make it a comprehensive and impactful initiative:
(এ আৰ আই এমৰ বৈশিষ্ট্য হৈছে কেইবাটাও মূল বৈশিষ্ট্য যিয়ে ইয়াক এক ব্যাপক আৰু প্ৰভাৱশালী পদক্ষেপ কৰি তুলিছে)

  • Holistic Approach: The mission adopts a holistic approach, addressing a wide range of infrastructure needs across various sectors.

  • Community Participation: The mission emphasizes community participation in project planning, implementation, and monitoring to ensure local ownership and sustainability.

  • Convergence: The mission fosters convergence of resources and expertise from various government departments and agencies to achieve maximum impact.

  • Technology Integration: The mission utilizes innovative technologies to improve project efficiency and transparency.

Facilities Covered under ARIM:

The ARIM encompasses a wide range of infrastructure facilities, including:
(আৰিমে আন্তঃগাঁথনিৰ বহুতো সুবিধা সামৰি লৈছে, য’ত আছে)

  • Roads and Bridges: Construction and upgradation of rural roads, bridges, and culverts to improve connectivity.

  • Irrigation and Drainage: Development of irrigation canals, drainage systems, and water conservation structures to enhance agricultural productivity.

  • Flood Protection: Construction of embankments, drainage channels, and flood shelters to mitigate the impact of floods.

  • Drinking Water and Sanitation: Provision of clean drinking water through pipelines, handpumps, and rainwater harvesting systems, along with construction of toilets and sanitation facilities.

  • Renewable Energy: Installation of solar panels, biogas plants, and other renewable energy sources to provide clean and sustainable power supply.

Eligibility for ARIM:

The ARIM is primarily targeted towards rural communities in Assam, including villages, panchayats, and blocks. Specific eligibility criteria may vary depending on the type of infrastructure being developed.

Application Process:

The application process for ARIM projects typically involves the following steps:
(ARIM প্ৰকল্পৰ বাবে আবেদন প্ৰক্ৰিয়াত সাধাৰণতে তলত দিয়া পদক্ষেপসমূহ জড়িত হৈ থাকে)

  1. Project Identification: Identification of priority infrastructure needs by the local community and panchayat.

  2. Project Proposal: Preparation of a detailed project proposal outlining the project scope, estimated costs, and implementation plan.

  3. Technical Scrutiny: Technical evaluation of the project proposal by the concerned authorities.

  4. Fund Allocation: Allocation of funds for approved projects based on budget availability and project priorities.

  5. Project Implementation: Execution of the project by the implementing agency under the supervision of the panchayat and concerned authorities.

  6. Monitoring and Evaluation: Regular monitoring of project progress, followed by a comprehensive evaluation upon completion.

Important Dates

Key dates related to the ARIM will be announced by the Assam government from time to time. These may include deadlines for project proposal submissions, fund allocation, and project completion.

Important Links

For more information on the Assam Rural Infrastructure Mission (ARIM), please refer to the following links:

  • Official Website of the Assam Government: Click here

  • Department of Rural Development, Assam: Click here

  • Assam State Rural Livelihood Mission (ASRLM): Click here

 

Read More Contents: Click here